Hi,welcome to Changzhou Leanevey Automation Equipment Co., Ltd. !
1. Double-sided removal of metal layer with double-sided metallization fifilm.
2. With the function of outsourcing and insertion, it can effffectively solve the capacitance appearance problems such as safety fifilm, high square resistance, super-thin fifilm, save metal fifilm and improve product performance.
3. Synchronized winding of double-drive gear transmission structure maximizes production effiffifficiency and ensures the stability of transmission accuracy.
4. This machine adopts Siemens enhanced Smart PLC and touch screen control, with capacity calculation, parameter storage, data reading functions, to achieve intelligent operation.
5. Internal and external washing can adjust, shorten the length, save materials and improve effiffifficiency.
6. Air guide mechanism can be added according to product requirements to effffectively prevent material deviation and improve quality.
7. The machine can choose to add explosion-proof fifilm cleaning mechanism according to product requirements.
8. Integral rack and main winding mechanism can improve the seismic resistance and ensure the accuracy and durability of the equipment.
9. Translational staggered side adjusting mechanism ensures the accuracy of the tray after moving and is convenient to operate. 10. The machine can be equipped with a key-type diaphragm disc automatic tightening mechanism, automatic core connection and core directional pre-pressing mechanism,and safety door.